SINCE 2004

  • 0

      0 Item in Bag


      Your Shopping bag is empty

      CHECKOUT
  • Notice

    • ALL COMPUTER, ELECTRONICS AND MECHANICAL COURSES AVAILABLE…. PROJECT GUIDANCE SINCE 2004. FOR FURTHER DETAILS CALL 9443117328

    Projects > COMPUTER > 2017 > NON IEEE > APPLICATION

    Textile Management System


    Abstract

    The project entitled “textile management system” is to reduce the manual work and enhances the accuracy of work. All the transactions are carried out online. This company deals with production of textile goods. This project aims at to monitor all process in the company, like order receiving, sampling, purchase of raw materials, production of goods, shipment and bills. As these works are done manually at the company at present it takes a lot of time to complete the work. The main goal of this project is to reduce manual works, increase the processing speed and ensure reliability of data. All process needed for the textile management is recorded for providing good information to the concern. Various reports are generated based on the requirement. Reports will present the management with the current position of the company. The project comprises eight departments such as order receiving, sampling, purchase, processing, production, warehousing, shipment and billing. Another important feature of this project is online ordering. The customer can order the products required online thus avoiding transportation cost.


    Existing System

    The system which is followed at present is a manual system. Important drawback of existing system is time factor. It will not help the management to solve the problem in time.


    Proposed System

    The drawbacks which are faced during existing system can be eradicated by using the proposed system. The main objective of the existing system is to provide a Electronic user-friendly interface. The system which is proposed now computerizes all the details that are maintained manually. Once the details are fed into the computer there is no need for various persons to deal with separate sections. Only a single person is enough to maintain all the reports.


    Architecture


    System Flow Diagram


    FOR MORE INFORMATION CLICK HERE